Narayani river crusie to be examined before Dashain; Aims to contribute in Visit Nepal 2020
Mon, Sep 16, 2019 2:31 PM on External Media, Latest,
The riverboat Cruise (mini ship), which is under construction now, on the bank of Narayani river will be examined before Dashain according to the Rhino Water Entertainment Pvt. Limited. The project is projected to be a major part of tourist attraction for the success of Visit Nepal 2020.
The exterior construction of Cruise has been completed and the work of painting and designing has been started which is esimated to be completed in 15 days,. Similarly, the main engine of the cruise will be imported till Saturday as per the Managing Director, Ramchandra Kandel.
It will be examined before Dashain as it will not take enough time to fit the engine. But the regular service of the cruise ship will start after Dashain.
The cruise can accommodate 200 people in seats and 30 people by standing.
The boat is now under construction on the bank of Narayani River in Kavreghat inside Gyaneshwor. The estimated operating cost of the cruise is Rs 15 crore. However, currently, it will be operated only for touristic purpose.
The research study to cover 25 km distance has been completed. The cruise with 2 floors will be cruising for 3 hours per travel. The route will be started from Kavreghat to Golaghat.