Company Profile:

Three Star Hydropower Limited is a public company with its site located in Province 1, Haleshi Tuwachung Municipality, Khotang. This hydropower project was established back in 2072 BS. With a total capacity of 7.151 MW, this hydro project received Survey License on 2073.07.09 BS and Generation License on 2074.09.03 BS. Kumar Kharel, Mohan Karki, and Madhav Mainali; the three founders named the company after them and then - named Three Star Hydro. These three were later joined by Uddhav Raj Shivakotee 'Kangal', Pradeep K Agrawal, Ananda P Manandhar, Zen Lama, and Ratna Bdr Newar.

About the issue:

Three Star Hydropower Limited will be issuing its IPO to the project-affected locals of Khotang District and Nepalese citizens working abroad from today i.e. on 11th Baisakh to 25th Baisakh, 2080. Note that for the locals of Khotang District, if the issue is not subscribed by the early closing date, the issue can be extended till 9th Jestha. However, the issue will be extended beyond the early closing date for Nepalese citizens working abroad.

The issued capital of the company is Rs. 49.25 Crores of which 10% i.e. 492,500 unit shares worth Rs. 4.92 crores have been allocated to project-affected locals of Khotang District. Meanwhile, 15% of the company's issued capital i.e. 738,750 unit shares will be issued later for the general public. Of this public issue, 10% of the shares totaling 73,875 units shares have been allocated for Nepalese citizens working abroad, the issue of which will open on the above mentioned date.

For the project-affected locals, the minimum application quantity is 10 units while the maximum quantity is 492,500 units. Meanwhile, for Nepalese citizens working abroad, the minimum application quantity is 10 units while the maximum quantity is 73,875 units.

Himalayan Capital Limited is appointed as the issue manager. The promoter-public share ratio will be 75: 25 after this IPO.

Click here for the offer letter

Three Star Hydropower Limited
Particulars Percentage Units Amount
Total Capital 100%      4,925,000.00    492,500,000.00
Total Issue (Project-affected Locals) 10%          492,500.00       49,250,000.00
Total Issue (Nepalese citizens working abroad) 1.50%            73,875.00         7,387,500.00
Issue Manager Himalayan Capital     
Issue Open Date 11th Baisakh    
Issue Closing Date (earliest) 25th Baisakh    
Issue Late Closing Date (for locals only) 9th Jestha    
Minimum Application (Project-affected Locals) 10    
Maximum Application (Project-affected Locals) 492,500    
Minimum Application (Nepalese citizens working abroad) 10    
Maximum Application (Nepalese citizens working abroad) 73,875    

Capital Structure:

Authorized Capital 50,00,00,000
Issued Capital 49,25,00,000
Current Paid-Up Capital 36,93,75,000
Capital after IPO Issuance  49,25,00,000

Shareholding Structure:

  Number of Shares Amount Percentage Remarks
Promoters Shareholders                             3,693,750.00       369,375,000.00 75% Already issued
Project-Affected Locals                                 492,500.00          49,250,000.00 10% To be issued
General Public (Including Nepalese citizens working abroad)                                 738,750.00          73,875,000.00 15.00% To be issued

Project Information:

Name of Project Sapsup Khola Small Hydroelectric Project
Type of Project Run-of-River
Installed Capacity 6.6 MW
Electricity Generation License received Mangsir 29, 2074
Generation Valid Date Mangsir 28, 2109
RCOD Poush 23, 2078
Total Cost   Rs. 1.39 Arba
Cost per Megawatt in Rs. Rs. 21.06 Crores

Board of Directors:

Name  Position
Mr. Kumar Kharel  Chairman
Mr. Ang Ingma Sherpa  Director
Mr. Pemba Tsering Lama  Director
Mr. Uddhav Raj Shivakotee  Director
Mr. Jen Lama  Director
Mr. Subarna Shakya  Director
Mr. Dhan Bahadur Shrestha  Director

Financial Statement:

Financial Highlights
Particulars Actual Estimated
2075/76 2076/77 2077/78 2079/80 (Q2) 2079/80 2080/81 2081/82
Total Paid-Up Capital ('000)      297,348.00   369,375.00   369,375.00      369,375.00    492,500.00   492,500.00   492,500.00
Reserve & Surplus ('000)      (13,090.00)   (15,209.00)   (52,992.00)      (45,883.00)      (3,849.00)      56,084.00   127,562.00
Debt ('000)      190,237.00   816,213.00   937,290.00      925,200.00                      -                       -                       -  
Revenue ('000)                        -                       -       43,588.00         89,545.00    228,037.00   234,879.00   241,925.00
Interest Expenses ('000)                        -                       -                       -                          -                        -                       -                       -  
Net Profit ('0000)        (1,328.00)      (2,119.00)   (37,744.00)           7,109.00      49,142.00      59,933.00     71,478.00
Earnings per share (Rs.)                 (0.45)              (0.57)           (10.22)                   7.44                 9.88              12.17              14.51
Net worth per share (Rs.)                 95.60              95.88              85.65                 93.09               99.22            111.39           125.90
Debt-Equity (times)                   0.67                2.30                2.96                   2.86                      -                       -                       -  
Return on Equity (%)                 (0.05)              (0.06)              (1.19)                   0.22                 1.01                1.09                1.15

ICRA Nepal:

ICRA Nepal has assigned an issuer rating o of Three Star Hydropower Limited to [ICRANP-IR] B- (pronounced ICRA NP issuer rating B minus). Issuers with this rating are considered to have a high risk of default regarding the timely servicing of financial obligations.

Credit Strengths

  • Timely commissioning of the project.
  • Low tariff and offtake risks.

Credit Challenges

  • Stretched liquidity results in delays in serving bank obligations.
  • High project cost and low generation.
  • High hydrology risks, given the lack of deemed generation clause in PPA.